Winner: 2013 NWCB Outstanding Project of the Year (Suspended Ceiling, United States)
Winner: 2013 Construction Excellence Awards: Silver (Interior Finishes, West Region)
Winner: 2013 AIA Portland Design Excellence Award: Merit

The Colonel Nesmith Readiness Center

When Thomas Hacker Architecture (THA) was commissioned to design the Colonel Nesmith Readiness Center in Dallas, Oregon, they considered it a high honor. Derek deVille, the lead architect, informed 9Wood that "it was a real honor to work for the Oregon National Guard. The Guard is unique in how they serve the community, state, and country as a whole."

The Nesmith Readiness Center is the new location for the 162nd Combat Engineering Company. THA wanted to incorporate elements that really evoke the "hands-on" quality of combat engineers, which is why 9Wood was brought on to provide the walls and ceilings for the main Grange Hall.

9Wood's custom capabilities with the 1100 Cross Piece Grille were a major factor in being selected for the completed space. For this project, THA chose solid two inch wide by four inch deep Western Hemlock. The grille panes were provided in two different member spacings to alter the look as the eye follows the walls up to the ceilings. By removing 9Wood's final sanding process, the Western Hemlock Grilles have a rough-sawn texture, as well as markings from the kiln-drying process. This gives the Grange Hall a feel of having been in service for decades, while having only been completed in October of 2012.

Architect Derek deVille continues by stating that "wood is a common building material in the Pacific Northwest. There's a large tradition of wood structures both for Grange Halls and also the large barns of the area. 9Wood seemed to be the perfect sort of material for that." The Hemlock was harvested within 500 miles of the jobsite, adding to the regional-sourcing aspect.

Walking into the Grange Hall, the vast, naturally-lit space is warm and inviting. The wall grilles utilize a tighter spacing, framing the multiple access doors on each side. At 12 feet up the wall, the spacing between grille members doubles, transitioning to the ceiling and up to the peak of the hall. This wider spacing allows the skylights to filter light throughout the space, highlighting the texture and grain of the Western Hemlock as the light passes through.

The Colonel Nesmith Readiness Center is a grand addition to the Oregon National Guard and the Dallas community. Designed for Guard assemblies and community events, the Grange Hall will stand as a welcoming space for years to come. The 9Wood walls and ceilings are a highlight of the building's design, and a beautiful tie-in of the rich history of Northwestern American culture. Receiving a Northwest Walls & Ceilings Bureau's 2013 Outstanding Project award only adds to the special nature and design of this unique project.

Back to Project Page



Wood Ceilings in 9 Minutes

Heads Up:

Ensure a successful design outcome: Learn about how to design and specify a better wood ceiling. 9Wood has some heads-up advice.

Learn More...

Kick-Off WebCom

Get Ready:

9Wood has brought the traditional on-site meeting into the 21st Century. See how we'll help manage your schedule.

Learn More...

Revit Models

Beta Test:

9Wood is bringing its model library up to date, and we're looking for testers. If you'd like to participate, click below.

Learn More...


© 2017 9Wood | All rights reserved. | FSC® License Code FSC-C012655.